CN C40-8 2041 brings U789's train down to a crawl preparing to make a left hand turn at Iron Junction to connect with the Iron Range Sub.
U789's train pulls into Iron Junction where it is about to hang a left towards the docks at Two Harbors.
IC SD40-3 6253 teams up with DMIR SD40T-3s 407 and 400 heading back to the docks at Two Harbors with 145 loads of iron ore from Minntac.